Discussion:
Code 214R at post.

History: Worn drive units from pushing loads: no complained of no power and erattic take off. Rebuilt both drive units. Apon start up still exspeienced Right motor problems. Acting as thow a leg in the controller was open. Started receiving a 214R code. Trouble shot per manual. Found no external system concerns. Took and moved cables for left and right motors and trouble followed from the right motor to the left motor. Installed controller in a like unit and problem followed. Sent controller out to Flight systems for repair. Received unit back and followed instructions for installation and unit ran without any operational problems. Put unit on charger and now two days later I have a constant 214R at post. Followed trouble shooting once more and still no external concerns. I have a good key source voltage for key switch with voltage drop at.07v at wire 10 terminal C3, ground at c19 wire 103 voltage drop at.007v, resistance at the motor with cables was identical at.30 ohms for both motors and no shorts to frame. Any further Ideas that could be evecting this unit??????
  • Posted 19 Oct 2012 23:31
  • By Bulldog965
  • joined 15 Oct'09 - 63 messages
  • Indiana, United States
Richard

Post your Reply

Forkliftaction accepts no responsibility for forum content and requires forum participants to adhere to our rules of conduct. Click here for more information.

If you are having trouble using the Discussion Forums, please contact us for help.

Fact of the week
In Germany, the 9th of November is sometimes called Schicksalstag, the "Day of Fate" because it has been the day for several major historical events, including the horrors of Kristallnacht in 1938 and the fall of the Berlin Wall in 1989.
Latest job alerts …
Muncie, IN, United States
Upcoming industry events …
February 5-7, 2026 - Mumbai, India
April 14-16, 2026 - São Paulo, Brazil
June 9-11, 2026 - Johannesburg, South Africa
Fact of the week
In Germany, the 9th of November is sometimes called Schicksalstag, the "Day of Fate" because it has been the day for several major historical events, including the horrors of Kristallnacht in 1938 and the fall of the Berlin Wall in 1989.
Global Industry News
edition #1255 - 6 November 2025
In this week’s Forkliftaction News , Hyster-Yale says it is reducing production because of “softer demand” as it reports revenue for Q3 was USD979 million, a drop both year-on-year and quarter-on-quarter... Continue reading
Editorial calendar - planned features
CONSTRUCTION FORKLIFTS
HANDLING GOODS IN THE COLD
LOADING/UNLOADING FREIGHT
BROWNFIELD AUTOMATION
FORKLIFT ATTACHMENTS
BATTERY AFFORDABILITY AND LIFETIME
FORKLIFT SAFETY