Discussion:
DANA TE27 - APC200 Controller error 34.00

Hello,
I have a DANA TE27 with controller APC200 install on a Linde 09 Model: Rs46T FL012092. The APC 200 controller initially showed a the failure 93.1 = failed initialization of essential controller data in flash memory.

Following an upgrade of the firmware into the APC - The controller now shows a failure code 34:00, 34.04 and so on.

Does someone know this failure and what I can check/do ?
As per the fault code, it is mentioned that the wrong firmware is flashed into the APC200 and that I need to replace the APC 200, hydraulic I/o, engine control module.

Does anyone know if their are any alternatives ? why cant I just reload the correct firmware into the APC200

Thanks for the assistance

Regards

Steve
  • Posted 7 Jul 2020 17:02
  • Modified 10 Jul 2020 20:06 by poster
  • By Steve_Tanner
  • joined 7 Jul'20 - 1 message
  • Mauritius

Post your Reply

Forkliftaction accepts no responsibility for forum content and requires forum participants to adhere to our rules of conduct. Click here for more information.

If you are having trouble using the Discussion Forums, please contact us for help.

Fact of the week
In March 2002, identical twins in Finland died on the same day in similar accidents within hours of each other. A 70-year-old man was killed by a truck while cycling; hours later, his twin brother was killed by a truck on the same road, about a mile away, before the family had been informed of the first accident.
Latest job alerts …
Oxford Ct, United States
New York Staten Island, United States
Upcoming industry events …
November 27, 2025 - Jakarta, Indonesia
December 9-11, 2025 - Aktau, Kazakhstan
June 22-25, 2026 - Chicago, Illinois, United States
Toplift Ferrari TFC36-48
Stoney Creek, Ontario, Canada
Used - Sale
USD1
Crown CG33P5
Braeside, Melbourne, Victoria, Australia
Hire

PREMIUM business

Combilift Ltd
Manufactures world class 4-way Handling Solutions
Latest job alerts …
Oxford Ct, United States
New York Staten Island, United States
Editorial calendar - planned features
CONSTRUCTION FORKLIFTS
HANDLING GOODS IN THE COLD
LOADING/UNLOADING FREIGHT
BROWNFIELD AUTOMATION
FORKLIFT ATTACHMENTS
BATTERY AFFORDABILITY AND LIFETIME
FORKLIFT SAFETY