Hi there,
Has anyone out there installed/or know someone who has installed a satellite/robot racking system with a single VNA aisle through the centre and operating a Turret Truck.
Would love to know if it is possible? What challenges? Efficiencies etc.
Cheers
This is ONLY to be used to report flooding, spam, advertising and problematic (harassing, abusive or crude) posts.