Report this forum post

Does anyone have a sequence of operation list for the drive operation of this unit? My main contactor kicks on and what I believe to be the steer motor is kicking on. The seat switch only shows.7v going to it but I can tell if this traces back to the controller in the dash or not.
The accel pedal gets a 10v feed but when checking resistance, the reading goes from 4.07 to open. Nothing in between.

** I believe my issue is the module in the dash but I need a wiring diagram showing the path of the seat switch feed.

Hopefully y'all can help me out.
I work for an old TCM dealer but we do not have this manual.
  • Posted 29 Jul 2025 08:58
  • By Charles_Kusmier
  • joined 29 Jul'25 - 1 message
  • North Carolina, United States
Just because its older, don't make it better except for GE.

This is ONLY to be used to report flooding, spam, advertising and problematic (harassing, abusive or crude) posts.

Indicates mandatory field
Editorial calendar - planned features
CONSTRUCTION FORKLIFTS
HANDLING GOODS IN THE COLD
LOADING/UNLOADING FREIGHT
BROWNFIELD AUTOMATION
FORKLIFT ATTACHMENTS
BATTERY AFFORDABILITY AND LIFETIME
FORKLIFT SAFETY

PREMIUM business

Cascade Corporation (World HQ)
Leading manufacturers of attachments, forks and related technologies for forklifts and AGVs.
Fact of the week
Ancient Egyptian civilization lasted for so long - over 3,000 years - that by the time of the New Kingdom (c. 1550-1070 BCE) Ancient Egyptian archaeology was a career option.
Upcoming industry events …
October 12-15, 2026 - Detroit, MI, United States
October 30, 2026 - Johannesburg, South Africa
Global Industry News
edition #1284 - 4 June 2026
It has been a big week of product launches for the materials handling sector... Continue reading
Fact of the week
Ancient Egyptian civilization lasted for so long - over 3,000 years - that by the time of the New Kingdom (c. 1550-1070 BCE) Ancient Egyptian archaeology was a career option.