A suitable fuel system would require an accumulator the size of the Hindenburg. Tethering would be an insurmountable problem to begin with, especially if done on the counterweight and the steer axle is unloaded due to uplift. One could let their imagination run wild. There may, possibly, be a role for Scottish bagpipes in this scenario, however. A 4 stage mast at maximum elevation with a max capacity load cannot have improperly dampened surges. And, I would add, that a properly dampened surge under this condition is a risk of testing the overhead guard anyway.
This is ONLY to be used to report flooding, spam, advertising and problematic (harassing, abusive or crude) posts.