Report this forum post

Thanks for the reply, that's a good idea, that was my next step, wasn't sure if I was forgetting something that I should have disconnected.
If this had been a Nissan I would have been finished in around 4-5 hours. Gotta love them Hysters!
  • Posted 13 Sep 2020 12:00
  • By raymond_j
  • joined 28 Feb'17 - 17 messages
  • California, United States
I can't fix stupid, but I can fix what stupid does.

This is ONLY to be used to report flooding, spam, advertising and problematic (harassing, abusive or crude) posts.

Indicates mandatory field
Editorial calendar - planned features
CONSTRUCTION FORKLIFTS
HANDLING GOODS IN THE COLD
LOADING/UNLOADING FREIGHT
BROWNFIELD AUTOMATION
FORKLIFT ATTACHMENTS
BATTERY AFFORDABILITY AND LIFETIME
FORKLIFT SAFETY
Aichi RX07B
Yokohama, Japan
Used - Sale
Terberg YT223
Balling, Denmark
Used - Sale
Editorial calendar - planned features
CONSTRUCTION FORKLIFTS
HANDLING GOODS IN THE COLD
LOADING/UNLOADING FREIGHT
BROWNFIELD AUTOMATION
FORKLIFT ATTACHMENTS
BATTERY AFFORDABILITY AND LIFETIME
FORKLIFT SAFETY