Report this forum post

I see this is a fairly old topic but thought I would throw my 2 cents in anyway. I am not entirely sure of the exact requirement for storing the pre-shift inspections although I know we keep a hard copy of the past 12 months worth of inspections available and then digitize them all after that timeframe. At the same time we are a forklift distributor and not your average user but I will see if I can do some additional digging on this topic.
  • Posted 18 Apr 2018 04:56
  • By TriLiftNC
  • joined 10 Jul'15 - 3 messages
  • North Carolina, United States
http://www.tri-lift.com

This is ONLY to be used to report flooding, spam, advertising and problematic (harassing, abusive or crude) posts.

Indicates mandatory field

PREMIUM business

ATEX MIRETTI GROUP
Miretti Explosion Proof Systems for Material Handling: for over 50 years, "Ex Atex Safety in Explosive & Hazardous Areas".
Movers & Shakers
Steve Nation Steve Nation
Senior solutions sales engineer, Numina Group
President, International Federation of Robotics
VP of Corporate Remarketing, Alta Material Handling
Chief executive officer, Peak Technologies