Crown WP2300 SERIES:
handle tenioner replacement and special tools needed

wanting to know how to replace the springs in the handle and how to load them after it is assembled.
  • Posted 14 Sep 2017 04:59
  • Discussion started by MaintenanceJAR
  • Indiana, United States
Showing items 1 - 1 of 1 results.
From the manual page M6.0-2720-001
Handle and Knuckle Disassembly
Should it become necessary to remove the control handle
from the knuckle to replace springs and/or shaft, or make
repairs to the assembly. The following steps should be
followed:
1. Lift and block truck as needed, and disconnect battery.
2. Raise control handle to its full upright position.
3. Drive out roll pin holding left side of shaft. The shaft
should turn counterclockwise approximately 20°. If the
shaft does not rotate a face spanner wrench may be
used to rotate the shaft and relieve the spring tension.
4. Drive the shaft toward the right side as needed to
remove springs.
5. Thoroughly clean all steer components and inspect
springs, shaft and knuckle for uneven wear or cracks.
If necessary replace any components at this time.

Handle and Knuckle Assembly
Before assembling handle, springs, and knuckle, inspect all
components for uneven wear, cracks, or other damage. If
any abnormal wear or damage appears that creates any
doubt that steering may be affected, replace with new parts
Assemble the control handle and springs as follows:
1. Reverse steps 1 thru 5 above.
2. With control handle in its full upright position, tension
the rotary shaft by using a face spanner wrench and
turning approximately 20° clockwise or until the roll pin
holes align with the knuckle.
3. Drive a roll pin into position to hold shaft and spring
assembly in place.
4. Check for proper operation.
Spring Adjustment
The rotary shaft is fixed on the left side at the knuckle with a
roll pin. If the spring pressure reduces over time or the handle
no longer returns to the upright position, the springs can be
re-tensioned as follows:
1. Lift and block truck as needed, and disconnect battery.
2. Raise control handle to its full upright position.
3. Drive out roll pin holding left side of shaft. Using a face
spanner wrench rotate the shaft clockwise until the
offset roll pin hole on the right side aligns with the
knuckle and drive in new roll pin.
4. Check for proper operation.
  • Posted 3 Jan 2018 17:01
  • Reply by margaret_w
  • Arizona, United States

Post your Reply

Forkliftaction.com accepts no responsibility for forum content and requires forum participants to adhere to the rules. Click here for more information.

Having trouble using the Discussion Forums? Contact us for help.

Upcoming in the editorial calendar
MATERIALS HANDLING ATTACHMENTS
Apr 2025
ARTIFICAL INTELLIGENCE
May 2025
Latest job alerts …
Evansville, IN, United States
Cincinnati, OH, United States
Louisville, KY, United States
St. Louis, MO, United States
Hitachi HX64B2
Yokohama, Japan
Used - Sale
Toplift Ferrari TFC36-48
Stoney Creek, Ontario, Canada
Used - Sale
USD1
Fact of the week
In 1903, the first Tour de France was held in Paris. The cycling race had been postponed and prize money boosted after it failed to draw enough competitors. Invented to lift the circulation of newspaper L'Auto, it comprised of six long stages totalling 2,428 kilometres.
Advance CS7000
Illinois, United States
Used - Sale & Hire
USD8,000
Terberg BC182
Balling, Denmark
Used - Sale
Global Industry News
edition #1227 - 24 April 2025
It continues to be impossible to ignore the uncertainty surrounding the US administration’s tariffs with the last week's news around how the changing macroeconomic landscape will impact our sector... Continue reading