Discussion:
Error code 4A

Unit is equippped with the Vechile Manager and flashing Error code 4A. Any help would be great.
  • Posted 24 Feb 2012 04:23
  • By robin_f
  • joined 24 Feb'12 - 1 message
  • Alberta, Canada
Showing items 1 - 2 of 2 results.
Code 4A NOTE: If Brake Release Switch (S12) is in service mode, Code 4A will
occur during Power Up SelfTest (POST).
Corrective Actions and
Checks
1. The "X" contactor or its wiring may be bad. Run test:
* O01 - Toggle the "X" Contactor
2. The auxiliary sense circuit may be bad. Run test:
* A09 - X Sense Voltage
3. Check the 15 amp slo/blow fuse in the B+ line filter. If it is open,
check the battery. If the battery has low voltage, consider raising the
cutout percentage in the Configure Mode to prevent the fuse from
blowing again due to a low battery condition.
  • Posted 30 Aug 2012 13:59
  • By derrick_r
  • joined 28 Aug'12 - 16 messages
  • Utah, United States
Most likely blown fuse in line filter next to contactors. Usually caused by low battery voltage.
  • Posted 25 Aug 2012 11:53
  • By barry_r
  • joined 3 Aug'12 - 1 message
  • Ohio, United States

Post your Reply

Forkliftaction accepts no responsibility for forum content and requires forum participants to adhere to our rules of conduct. Click here for more information.

If you are having trouble using the Discussion Forums, please contact us for help.

Terberg RT223
Balling, Denmark
Used - Sale
Manitou MH25-4
Braeside, Melbourne, Victoria, Australia
Hire
Global Industry News
edition #1256 - 13 November 2025
Automation is a key theme in the stories we have in this week’s Forkliftaction News ... Continue reading
Editorial calendar - planned features
CONSTRUCTION FORKLIFTS
HANDLING GOODS IN THE COLD
LOADING/UNLOADING FREIGHT
BROWNFIELD AUTOMATION
FORKLIFT ATTACHMENTS
BATTERY AFFORDABILITY AND LIFETIME
FORKLIFT SAFETY
Terberg RT223
Balling, Denmark
Used - Sale
Manitou MH25-4
Braeside, Melbourne, Victoria, Australia
Hire
Upcoming industry events …
November 27, 2025 - Jakarta, Indonesia
December 9-11, 2025 - Aktau, Kazakhstan
June 22-25, 2026 - Chicago, Illinois, United States
Editorial calendar - planned features
CONSTRUCTION FORKLIFTS
HANDLING GOODS IN THE COLD
LOADING/UNLOADING FREIGHT
BROWNFIELD AUTOMATION
FORKLIFT ATTACHMENTS
BATTERY AFFORDABILITY AND LIFETIME
FORKLIFT SAFETY