Discussion:
11505

I get codes 30-1, 30-2 as in lift modes, cycle key, may work for 30 sec or 30 days, any insight
  • Posted 30 Oct 2009 02:26
  • By Barfly_olaf
  • joined 10 Oct'09 - 81 messages
  • Nova Scotia, Canada
SEMPER FIDELIS
Showing items 1 - 2 of 2 results.
Thank you, I was that lucky, contactor was not snapping in and tips were burnt, replaced and a one
  • Posted 17 Nov 2009 01:45
  • By Barfly_olaf
  • joined 10 Oct'09 - 81 messages
  • Nova Scotia, Canada
SEMPER FIDELIS
those codes can be caused by bad contact tips or conections at cable terminals. you're probably not going to be that lucky because it can also be caused by the (cpu) the main contactor needs battery voltage to pull in then the voltage is lowered to somewhere around 10v to hold in and not overheat the coil. what happens sometimes is that the pull in voltage never happens so the contactor does not get fully pulled in. if you open the right side panel, turn the unit on, reach in and push the contactor manually and it pulls further in and locks you got a cpu problem. there is homemade relay / timer circuit that you can make but its a sneak attack and not a sanctioned repair.
  • Posted 30 Oct 2009 03:30
  • By rick_c
  • joined 30 Jul'09 - 204 messages
  • Texas, United States
technology: (no user serviceable parts inside)

Post your Reply

Forkliftaction accepts no responsibility for forum content and requires forum participants to adhere to our rules of conduct. Click here for more information.

If you are having trouble using the Discussion Forums, please contact us for help.

Latest job alerts …
Muncie, IN, United States
Crown RD572513TT6860R
Braeside, Melbourne, Victoria, Australia
Hire
Factory Cat MICROMAG20D
Morgantown, Pennsylvania, United States
Used - Sale
Fact of the week
In Germany, the 9th of November is sometimes called Schicksalstag, the "Day of Fate" because it has been the day for several major historical events, including the horrors of Kristallnacht in 1938 and the fall of the Berlin Wall in 1989.
Upcoming industry events …
February 5-7, 2026 - Mumbai, India
April 14-16, 2026 - São Paulo, Brazil
June 9-11, 2026 - Johannesburg, South Africa
Latest job alerts …
Muncie, IN, United States
Movers & Shakers
Deborah Baker Deborah Baker
Board chair, Equipment Leasing & Finance Association
Vice president of manufacturing operations, Hytrol Conveyor Company
VP sales Europe, EP Equipment Europe
Group president - Vancouver operations, Columbia Machine