Discussion:
Very hard cold start

Have to crank long time several times to get lift to start. Once warm lift start easy. Happens every morning. Fuel lock off solenoid working & has been cleaned, LP fuel lines clean, no leaks. Battery is strong.
  • Posted 18 Dec 2012 13:38
  • By NWLift
  • joined 18 Dec'12 - 1 message
  • Washington, United States
Showing items 1 - 1 of 1 results.
After sitting overnight and acting the way it is, I suggest you check the condition of the large diameter vapor hose coming from the regulator and spanning over to the metal pipe near the valve cover. These hoses will sort of "unravel" or split due the the robust vibrations of the engine.
A hose with a split in it can completely empty of all propane vapors after sitting overnight and the split will made it slow to draw fuel out of the regulator at cranking RPM.
You might have to remove the hose for a thorough inspection.
Are you pressing the accelerator pedal when you do your cold start?
If not, you may want to try holding the accelerator down while cranking as that can make it easier to draw fuel out of the regulator.
  • Posted 18 Dec 2012 15:31
  • By L1ftmech
  • joined 25 Apr'12 - 394 messages
  • Tennessee, United States

Post your Reply

Forkliftaction accepts no responsibility for forum content and requires forum participants to adhere to our rules of conduct. Click here for more information.

If you are having trouble using the Discussion Forums, please contact us for help.

Global Industry News
edition #1254 - 30 October 2025
In this week’s Forkliftaction News - As an industry, our focus is often on key economic indicators such as productivity and profitability, but we all know our sector simply wouldn’t exist without the skilled operators who bring the machinery to life... Continue reading
Fact of the week
The word "robotics" was coined by Russian-born American science-fiction writer Isaac Asimov who first used the word in 1942 in his short story 'Runabout'. He characterised robots as helpful servants and as "a better, cleaner race."
Editorial calendar - planned features
CONSTRUCTION FORKLIFTS
HANDLING GOODS IN THE COLD
LOADING/UNLOADING FREIGHT
BROWNFIELD AUTOMATION
FORKLIFT ATTACHMENTS
BATTERY AFFORDABILITY AND LIFETIME
FORKLIFT SAFETY
Movers & Shakers
Kai von Berg Kai von Berg
VP sales Europe, EP Equipment Europe
Group president - Vancouver operations, Columbia Machine
Business development manager - UK, IRE, BENELUX, Tyri Lights
President and CEO, Wajax Corporation