Discussion:
Intermittent Power to Propane regulator

I have a Toyota 42FG25, with an intermittent power to the regulator solenoids. Does someone have a schematic so I can find the source of the problem.
Or if you know where the power is triggered, battery voltage was present, the machine ran briefly but then died and the power at the connector is missing.
Thanx
  • Posted 11 Oct 2012 11:36
  • By Wajaxed
  • joined 16 Feb'10 - 23 messages
  • British Columbia, Canada
If it wasn't for human error and negligence, I would have nothing to do most days.
Stay safe

Ed
Showing items 1 - 1 of 1 results.
The power for the propane solnoid comes from a relay behind the left ( as sitting on the machine) step, more or less under the fuse box. It gets it trigger to turn on by the distributor. I don't know the color codes to the relay, etc off the top of my head. On alot of Toyotas- the wiring breaks coming out of the distributor- I'd check there first.
  • Posted 16 Oct 2012 00:12
  • By bbforks
  • joined 1 Mar'12 - 1,437 messages
  • Pennsylvania, United States
bbforks (at) Hotmail (dot) com
Customers love technology- until they have to pay to fix it!

Post your Reply

Forkliftaction accepts no responsibility for forum content and requires forum participants to adhere to our rules of conduct. Click here for more information.

If you are having trouble using the Discussion Forums, please contact us for help.

Global Industry News
edition #1260 - 11 December 2025
In this week’s Forkliftaction News we report on DHL Supply Chain signing a deal to deploy autonomous mobile robots (AMRs) at its Mexican retail operations and look at Guidance Automation’s successful trial of an AMR with a hydrogen fuel cell... Continue reading
Editorial calendar - planned features
CONSTRUCTION FORKLIFTS
HANDLING GOODS IN THE COLD
LOADING/UNLOADING FREIGHT
BROWNFIELD AUTOMATION
FORKLIFT ATTACHMENTS
BATTERY AFFORDABILITY AND LIFETIME
FORKLIFT SAFETY
Toyota 02-8FD25
Yokohama, Japan
Used - Sale
Toyota 3FD100
Yokohama, Japan
Used - Sale
Upcoming industry events …
January 28-30, 2026 - Bangkok, Thailand
March 4-5, 2026 - Detroit, Michigan, United States
March 24-26, 2026 - Stuttgart, Germany
Movers & Shakers
Jett Chitanand Jett Chitanand
President EPG Americas, Ehrhardt Partner Group (EPG)
CEO, Duravant
Manager of automated solutions engineering and implementation, MHS Lift
President and CEO, Manitou Group
Editorial calendar - planned features
CONSTRUCTION FORKLIFTS
HANDLING GOODS IN THE COLD
LOADING/UNLOADING FREIGHT
BROWNFIELD AUTOMATION
FORKLIFT ATTACHMENTS
BATTERY AFFORDABILITY AND LIFETIME
FORKLIFT SAFETY