Report this forum post

Check main contactor first, wiring to same and coil. Then check sterr controller
  • Posted 13 Aug 2016 01:20
  • By Roibeard
  • joined 2 Mar'10 - 335 messages
  • Dublin, Ireland

This is ONLY to be used to report flooding, spam, advertising and problematic (harassing, abusive or crude) posts.

Indicates mandatory field
Fact of the week
At the opening ceremony of the Sydney Harbour Bridge in 1932, marching bands were instructed to walk out of step as they crossed the bridge. This unusual directive was given as a precaution due to concerns about the bridge's structural integrity during its early use.
TCM FHD105Z
Yokohama, Japan
Used - Sale
Mitsubishi Logisnext FD25T5M
Yokohama, Japan
Used - Sale
Latest job alerts …
Danville, IL, United States
Upcoming industry events …
September 24-25, 2025 - Tangiers, Morocco
September 25, 2025 - South Brisbane, QLD, Australia
October 23, 2025 - Atlanta, GA, United States
Upcoming in the editorial calendar
MANAGING MIXED FLEETS
Oct 2025
ASSET FINANCE
Nov 2025