Report this forum post

I have a CFG103 with a lot of new parts... Brakes, Tires, Head recently redone, Hydraulics rebuilt. I bought it last year. It needs rings, which should finish it off, but it does run. Are you interested? Reply to [email address removed]
  • Posted 23 Nov 2013 02:42
  • By Ron_B
  • joined 23 Nov'13 - 1 message
  • Ohio, United States

This is ONLY to be used to report flooding, spam, advertising and problematic (harassing, abusive or crude) posts.

Indicates mandatory field
Global Industry News
edition #1244 - 21 August 2025
In our feel good story for the week, we report on a donation from Wisconsin-headquartered Big Forklifts to the University of Wisconsin-Madison’s College of Engineering, after discovering the institution was still using one of its 1960s walkie stackers... Continue reading
Fact of the week
Portugal was the first country to implement a nationwide, automatic electronic toll collection system. This system allows vehicles to pass through toll booths without stopping, significantly improving traffic flow on highways.

PREMIUM business

GemOne
Telematics for industrial fleets. Fleet & safety management solutions: track vehicles, boost efficiency, operate safer, & avoid unexpected downtime.
Fact of the week
Portugal was the first country to implement a nationwide, automatic electronic toll collection system. This system allows vehicles to pass through toll booths without stopping, significantly improving traffic flow on highways.