Report this forum post

A replacement pot needs to be calibrated with Pathfinder.

Also its very easy to fit the pot incorrectly if you don't have experience at changing them, the little tab needs to be perfectly aligned when fitting - I've seen this happen before a couple of times when I've been called to look at a Linde.

Is this an official Linde trained engineer with Pathfinder coming back to look at it?
  • Posted 23 Aug 2013 03:59
  • By Forkingabout
  • joined 31 Mar'11 - 862 messages
  • england, United Kingdom

This is ONLY to be used to report flooding, spam, advertising and problematic (harassing, abusive or crude) posts.

Indicates mandatory field
Movers & Shakers
Jett Chitanand Jett Chitanand
President EPG Americas, Ehrhardt Partner Group (EPG)
CEO, Duravant
Manager of automated solutions engineering and implementation, MHS Lift
President and CEO, Manitou Group
Crown RR5225-30TT321
Braeside, Melbourne, Victoria, Australia
Hire
Taylor TX330S
Coraopolis, Pennsylvania, United States
Used - Sale & Hire
USD159,500
Upcoming industry events …
January 28-30, 2026 - Bangkok, Thailand
March 4-5, 2026 - Detroit, Michigan, United States
March 24-26, 2026 - Stuttgart, Germany
Global Industry News
edition #1260 - 11 December 2025
In this week’s Forkliftaction News we report on DHL Supply Chain signing a deal to deploy autonomous mobile robots (AMRs) at its Mexican retail operations and look at Guidance Automation’s successful trial of an AMR with a hydrogen fuel cell... Continue reading
Editorial calendar - planned features
CONSTRUCTION FORKLIFTS
HANDLING GOODS IN THE COLD
LOADING/UNLOADING FREIGHT
BROWNFIELD AUTOMATION
FORKLIFT ATTACHMENTS
BATTERY AFFORDABILITY AND LIFETIME
FORKLIFT SAFETY