Report this forum post

Does anybody out there work on flat rate? I've had several people from the automotive world tell me we should go to flat rate but I don't think that it would work in our industry.
We don't do a lot of constant repetitive tasks because we don't have the numbers that they do in automotive. Dpending on what type of environment the truck is operated in the same job could take a lot longer to accomplish.
If the possitives outweigh the negatives though, I think that it could be a good thing for techs and owners.
  • Posted 12 Feb 2010 22:34
  • By duodeluxe
  • joined 11 Feb'05 - 923 messages
  • United States
duodeluxe

This is ONLY to be used to report flooding, spam, advertising and problematic (harassing, abusive or crude) posts.

Indicates mandatory field
Taylor T650L
Coraopolis, Pennsylvania, United States
Used - Sale & Hire
JCB 533-105
Braeside, Melbourne, Victoria, Australia
Hire
Global Industry News
edition #1247 - 11 September 2025
In what may prove to be a sign of things to come, Canadian materials handling equipment lithium-ion battery manufacturer, UgoWork, has announced battery assembly for some forklifts bound for the North American domestic market will now be done in the US. See the story for full details... Continue reading
Fact of the week
At the opening ceremony of the Sydney Harbour Bridge in 1932, marching bands were instructed to walk out of step as they crossed the bridge. This unusual directive was given as a precaution due to concerns about the bridge's structural integrity during its early use.
Global Industry News
edition #1247 - 11 September 2025
In what may prove to be a sign of things to come, Canadian materials handling equipment lithium-ion battery manufacturer, UgoWork, has announced battery assembly for some forklifts bound for the North American domestic market will now be done in the US. See the story for full details... Continue reading
Fact of the week
At the opening ceremony of the Sydney Harbour Bridge in 1932, marching bands were instructed to walk out of step as they crossed the bridge. This unusual directive was given as a precaution due to concerns about the bridge's structural integrity during its early use.
Upcoming industry events …
September 24-25, 2025 - Tangiers, Morocco
September 25, 2025 - South Brisbane, QLD, Australia
October 23, 2025 - Atlanta, GA, United States
Fact of the week
At the opening ceremony of the Sydney Harbour Bridge in 1932, marching bands were instructed to walk out of step as they crossed the bridge. This unusual directive was given as a precaution due to concerns about the bridge's structural integrity during its early use.