Report this forum post

Hello HRSPWR

So after few days of waiting for the new regulator too arrive, it has been fitted and all is ok running perfect without any issue.

So with the old regulator replaced decided to strip the regulator down more indepth too see if can see any damage or cause of the overfuelling.

Removed the diagphram with adjuster screw on for fuel pressure and was a valve in bottom on a spring, removed this too check behind for damage too find it was cracked and rubber seals were badly perished, (seal part on spring side has a 2mm piece missing which i suspect is how the fuel is bypassing all the time.

Did not get either of these parts in the reseal kit that was purchased from TVH, so deicded too do a little more digging and eventually found the part, it comes as an EXTRA kit on top of the rebuild it.

If its any interest too people ive put the part number below:
04221-U2030-71 Valve Kit $70/£80

Thanks for all your help and hope this is of use to you also.
  • Posted 14 Jul 2020 01:38
  • By Lordmoss13
  • joined 3 Jul'20 - 16 messages
  • Wales, United Kingdom
Powerlift Materials Handling

This is ONLY to be used to report flooding, spam, advertising and problematic (harassing, abusive or crude) posts.

Indicates mandatory field
Fact of the week
Foundling hatches are safe, anonymous drop-off points for unwanted infants, allowing parents in crisis a way to surrender a baby safely without fear of punishment, ensuring the child is rescued and cared for. The concept started in the 12th century, was abandoned in the late 19th century, then reintroduced in 1952. It has since been adopted in many countries.
Global Industry News
edition #1260 - 11 December 2025
In this week’s Forkliftaction News we report on DHL Supply Chain signing a deal to deploy autonomous mobile robots (AMRs) at its Mexican retail operations and look at Guidance Automation’s successful trial of an AMR with a hydrogen fuel cell... Continue reading
Movers & Shakers
Jett Chitanand Jett Chitanand
President EPG Americas, Ehrhardt Partner Group (EPG)
CEO, Duravant
Manager of automated solutions engineering and implementation, MHS Lift
President and CEO, Manitou Group