Discussion:
Termination resistor

Can anybody tell me where the termination resistors are located on an S70ft ft
  • Posted 26 Jan 2019 10:02
  • By terry_c
  • joined 26 Feb'12 - 21 messages
  • Oregon, United States
Showing items 1 - 3 of 3 results.
go to diagnostic port and check ohms on yellow and the green wire I think is the light green wire it should read about 58 to 60 ohms. if not reads 120 ohms you have a broken wire or ONE OF THE CAN BUS controllers have failed.it also check wiring connection plugs. put email in your profile
  • Posted 9 Feb 2019 23:57
  • By redbull
  • joined 14 Oct'16 - 108 messages
  • Queensland, Australia
S70FT F187V11051E. [email address removed]
  • Posted 2 Feb 2019 03:40
  • By terry_c
  • joined 26 Feb'12 - 21 messages
  • Oregon, United States
serial number and email
  • Posted 1 Feb 2019 18:46
  • By redbull
  • joined 14 Oct'16 - 108 messages
  • Queensland, Australia

Post your Reply

Forkliftaction accepts no responsibility for forum content and requires forum participants to adhere to our rules of conduct. Click here for more information.

If you are having trouble using the Discussion Forums, please contact us for help.

Hangcha FLDCXT160
Braeside, Melbourne, Victoria, Australia
Hire
Crown RD572513TT6860R
Braeside, Melbourne, Victoria, Australia
Hire
Latest job alerts …
Bensenville, United States
Bensenville, United States
Monmouth, IL, United States
Fact of the week
The two internal cavities in our nose called nostrils function as separate organs. Each nostril has its own set of turbinates and olfactory receptors. The two independent organs work together through a mechanism called the nasal cycle, where one nostril is dominant for air intake while the other rests and is better at detecting scents.
Hangcha FLDCXT160
Braeside, Melbourne, Victoria, Australia
Hire
Crown RD572513TT6860R
Braeside, Melbourne, Victoria, Australia
Hire
Editorial calendar - planned features
CONSTRUCTION FORKLIFTS
HANDLING GOODS IN THE COLD
LOADING/UNLOADING FREIGHT
BROWNFIELD AUTOMATION
FORKLIFT ATTACHMENTS
BATTERY AFFORDABILITY AND LIFETIME
FORKLIFT SAFETY
Upcoming industry events …
March 3-7, 2026 - Las Vegas, NV, United States
January 28-30, 2026 - Bangkok, Thailand
31 March 2026 - Dubai, United Arab Emirates
Editorial calendar - planned features
CONSTRUCTION FORKLIFTS
HANDLING GOODS IN THE COLD
LOADING/UNLOADING FREIGHT
BROWNFIELD AUTOMATION
FORKLIFT ATTACHMENTS
BATTERY AFFORDABILITY AND LIFETIME
FORKLIFT SAFETY