Discussion:
still egv14 nail does not elevate

hello friends I have a forklift Still, EGV 14 which raises no nails, but if due to lower, back and forth normally, but when he sends raise does not respond, has changed the hand- and this is not the problem has been revised Combi Sem 1 module, and nothing has been found damaged, could someone give me some idea what I could be wrong on this computer, if anyone has had this type of failure, or had wishlist this stacking faults'll be very grateful...
  • Posted 20 Feb 2015 02:11
  • By Jorgeper
  • joined 13 Jun'14 - 3 messages
  • Lima, Peru
aun estoy pensando......
Showing items 1 - 1 of 1 results.
Hello friends, I've been finding out about this digital controller zapi that according see is a general controller for various brands, and I wonder if anyone has worked with this team and I indicque their experiences regarding the type of fault I have with this stacker still EGV14 which does not raise the mast, if I could be a programming problem or not.
Thanks for your time in advance

about this indicates about this driver

ZAPI Digital Console

Digital Console

Zapi controllers all have a serial output that is able to communicate with the external systems, such as personal computers. Zapi has developed an intelligent microprocessor based console, with a liquid crystal display, and various programming keys.

Technical details:
PROGRAMMING PARAMETERS:
maximum current, braking, acceleration rate, creep speed, 1st level of speed reduction, 2nd level of speed reduction.

TESTER:
provides a visual display of the analogue and digital measurements within the chopper (battery voltage, motor voltage, motor current, temperature, potentiometer voltage).

RESTORE:
enables a fast and digital return of previously set parameters. This may be used to programme machines that need to have the same operating characteristics.

ALARMS: this function visually displays the last 5 faults.
  • Posted 25 Feb 2015 03:28
  • By Jorgeper
  • joined 13 Jun'14 - 3 messages
  • Lima, Peru
aun estoy pensando......

Post your Reply

Forkliftaction accepts no responsibility for forum content and requires forum participants to adhere to our rules of conduct. Click here for more information.

If you are having trouble using the Discussion Forums, please contact us for help.

Movers & Shakers
Jett Chitanand Jett Chitanand
President EPG Americas, Ehrhardt Partner Group (EPG)
CEO, Duravant
Manager of automated solutions engineering and implementation, MHS Lift
President and CEO, Manitou Group

Showcased in the Virtual Expo

Movers & Shakers
Jett Chitanand Jett Chitanand
President EPG Americas, Ehrhardt Partner Group (EPG)
CEO, Duravant
Manager of automated solutions engineering and implementation, MHS Lift
President and CEO, Manitou Group
Latest job alerts …
Dayton, OH, United States
Erie, PA, United States
Editorial calendar - planned features
CONSTRUCTION FORKLIFTS
HANDLING GOODS IN THE COLD
LOADING/UNLOADING FREIGHT
BROWNFIELD AUTOMATION
FORKLIFT ATTACHMENTS
BATTERY AFFORDABILITY AND LIFETIME
FORKLIFT SAFETY