The spit/spray valve is to determine when the cylinder is filled to the 80% level. I would not have the cylinder filled while mounted on the forklift. Therefore, the cylinder can rest in its vertical position, on the ground, where it should be during the refilling stage.
This is ONLY to be used to report flooding, spam, advertising and problematic (harassing, abusive or crude) posts.