Report this forum post

if your MUX/ Tiller card is good, then check wire harness from tiller down thru tube. A continuity check will check for a short. my schematic shows me that its in the tiller card though. If your sure that all 3 Tiller cards are good and harness is good, then all you got left is the controller. good luck
  • Posted 1 Aug 2014 16:03
  • By YaleTechnician
  • joined 11 Dec'13 - 18 messages
  • California, United States

This is ONLY to be used to report flooding, spam, advertising and problematic (harassing, abusive or crude) posts.

Indicates mandatory field
Fact of the week
The word "okay" (or its abbreviation "OK") originated as a humorous misspelling. In the 1830s, a fad in Boston involved using abbreviations of intentionally misspelled phrases. "OK" stood for "oll korrect," a playful mispronunciation of "all correct".
Global Industry News
edition #1245 - 28 August 2025
In this week’s Forkliftaction News , we look at MHEDA’s Q3 Economic Advisory Report which reveals current resilience in the US materials handling sector... Continue reading
Movers & Shakers
Steve Dimitrovski Steve Dimitrovski
Director sales for Australia and New Zealand, Swisslog
General Manager, Forkpro Australia
Global CEO, Swisslog
Board member, UKMHA
Latest job alerts …
Dallas, TX or Lexington, KY, United States
Tampa/Orlando Florida, United States
Tampa, United States
Marietta, United States