Report this forum post

Well, if the system is set up properly and has the capability, you can write the question so the operator has to read it and not just answer yes to everything. For example you might ask "Are the Breaks in non-working condition" and if he says yes the system shuts down. Also you can record the time it takes for the operator to conduct his pre-op check list and if if is done to fast it will show up in the report.
  • Posted 8 Jan 2014 04:38
  • By GameChanger
  • joined 28 Dec'13 - 21 messages
  • Florida, United States

This is ONLY to be used to report flooding, spam, advertising and problematic (harassing, abusive or crude) posts.

Indicates mandatory field
Global Industry News
edition #1247 - 11 September 2025
In what may prove to be a sign of things to come, Canadian materials handling equipment lithium-ion battery manufacturer, UgoWork, has announced battery assembly for some forklifts bound for the North American domestic market will now be done in the US. See the story for full details... Continue reading

PREMIUM business

Tailift Material Handling Taiwan Co.,Ltd.
Focused simply for the new era.
Upcoming in the editorial calendar
MANAGING MIXED FLEETS
Oct 2025
ASSET FINANCE
Nov 2025
Fact of the week
At the opening ceremony of the Sydney Harbour Bridge in 1932, marching bands were instructed to walk out of step as they crossed the bridge. This unusual directive was given as a precaution due to concerns about the bridge's structural integrity during its early use.