Report this forum post

having 16 of these go into analyze and check voltages on pots 1, 2 if their out of electrical limit you will get the center handel on the display.. probbly have to change pot 1 thats the traction pot they have to be no more than 2.7 volts in nutrual position
  • Posted 24 Dec 2011 05:22
  • By irrk1
  • joined 5 May'11 - 24 messages
  • Massachusetts, United States

This is ONLY to be used to report flooding, spam, advertising and problematic (harassing, abusive or crude) posts.

Indicates mandatory field
Maxlion FD50T
Hangzhou, China
New - Sale
SMV (Konecranes) 4632CC5
Balling, Denmark
New - Sale
Upcoming industry events …
January 28-30, 2026 - Bangkok, Thailand
March 4-5, 2026 - Detroit, Michigan, United States
March 24-26, 2026 - Stuttgart, Germany
Editorial calendar - planned features
CONSTRUCTION FORKLIFTS
HANDLING GOODS IN THE COLD
LOADING/UNLOADING FREIGHT
BROWNFIELD AUTOMATION
FORKLIFT ATTACHMENTS
BATTERY AFFORDABILITY AND LIFETIME
FORKLIFT SAFETY
Maxlion FD50T
Hangzhou, China
New - Sale
SMV (Konecranes) 4632CC5
Balling, Denmark
New - Sale
Latest job alerts …
Dayton, OH, United States
Erie, PA, United States
Movers & Shakers
Jett Chitanand Jett Chitanand
President EPG Americas, Ehrhardt Partner Group (EPG)
CEO, Duravant
Manager of automated solutions engineering and implementation, MHS Lift
President and CEO, Manitou Group
Latest job alerts …
Dayton, OH, United States
Erie, PA, United States
Editorial calendar - planned features
CONSTRUCTION FORKLIFTS
HANDLING GOODS IN THE COLD
LOADING/UNLOADING FREIGHT
BROWNFIELD AUTOMATION
FORKLIFT ATTACHMENTS
BATTERY AFFORDABILITY AND LIFETIME
FORKLIFT SAFETY