Report this forum post

the compression numbers are 175 cyl 1, 90 cyl 2, 50 cyl3, 40 cyl4 based on these I would surmise I may have a blown head gasket between 3 and 4 however the difference between 1 and 2 is more than 10 percent which in my experience is the allowable tolerance. I am considering doing an in frame overhaul. or replace the engine. kinda depends on which i find to be cheaper. I dont need a new engine for as little as I will use the lift but I would like ti to be in half way decent shape.

now is this mazda engine an "industrial" engine or an automotive engine adapted for industrial use. can I go to the local parts store and get engine components? and what size is the engine? does this engine have removable cylinder sleeves? anything else I need to know before considering overhauling the engine vs replacement? thanks for the help guys.
  • Posted 13 Oct 2010 21:01
  • By craig_f
  • joined 26 Jul'10 - 26 messages
  • Iowa, United States

This is ONLY to be used to report flooding, spam, advertising and problematic (harassing, abusive or crude) posts.

Indicates mandatory field
Global Industry News
edition #1261 - 18 December 2025
In this week’s Forkliftaction News , we report on an activist investment firm increasing its stake in Toyota Industries Corp (TICO), in a bid to stop the privatisation of the materials handling equipment manufacturer... Continue reading
Upcoming industry events …
March 3-7, 2026 - Las Vegas, NV, United States
January 28-30, 2026 - Bangkok, Thailand
31 March 2026 - Dubai, United Arab Emirates
Movers & Shakers
James Brown James Brown
Chief operating officer, Bulldog Battery Corporation
Commercial excellence roll-out manager, TVH Parts
President EPG Americas, Ehrhardt Partner Group (EPG)
CEO, Duravant