My main concern is if you need to unload double stake load out of a trailer. Most over the road trailers or containers have about 108" of inside height. If you have two 48" packages position on two 4" high pallets that only leaves 3" of clearance above the top load. If this unit has a 130" 2 stage mast with a fully lowered height of 83" and it has "0" free lift the most common 2 stage mast spec. The inner channel will be at 110" when the forks are raised to the middle of the pallet for the top load. That is the problem the top of the trailer is 2" too short plus you have to lift the load up 5-6" to remove it off the double high stack. This is called the "Sun Roof" effect.

In Georgia we offered a 90 day bumper to bumper parts & labor warranty on all of our reconditioned (not rebuilt) units regardless of hours including 8000 -10,000 hrs. Most 5 year old units would have 5000-6000 hours.

If the unit had "real" low hours & we did the PM's on the unit we would go as high as 6 mos. Unless the unit was used in pickle foundry or fish cannery.
  • Posted 29 Sep 2010 07:00
  • By johnr_j
  • joined 3 Jun'06 - 1,446 messages
  • Georgia, United States

This is ONLY to be used to report flooding, spam, advertising and problematic (harassing, abusive or crude) posts.

Indicates mandatory field
Toyota 02-8FD25
Yokohama, Japan
Used - Sale
Maxlion FB35LI
Hangzhou, China
New - Sale
Global Industry News
edition #1261 - 18 December 2025
In this week’s Forkliftaction News , we report on an activist investment firm increasing its stake in Toyota Industries Corp (TICO), in a bid to stop the privatisation of the materials handling equipment manufacturer... Continue reading

Showcased in the Virtual Expo

Movers & Shakers
James Brown James Brown
Chief operating officer, Bulldog Battery Corporation
Commercial excellence roll-out manager, TVH Parts
President EPG Americas, Ehrhardt Partner Group (EPG)
CEO, Duravant