Report this forum post

Yes different battery, connected it to a different control system (SEM on a Hyster). At this time I checked the RPM of the motor and it is running at 3800, I'm checking this on the side of the comutator thru the brush holder hole. We are running 5 AMP on the field wires with no load. I plan on testing a different truck at a customers facility.
  • Posted 19 Aug 2010 22:44
  • By MAK54
  • joined 20 Apr'10 - 14 messages
  • Wisconsin, United States

This is ONLY to be used to report flooding, spam, advertising and problematic (harassing, abusive or crude) posts.

Indicates mandatory field
Upcoming industry events …
March 3-7, 2026 - Las Vegas, NV, United States
January 28-30, 2026 - Bangkok, Thailand
31 March 2026 - Dubai, United Arab Emirates
Latest job alerts …
Monmouth, IL, United States
Bensenville, United States
Bensenville, United States
Movers & Shakers
James Brown James Brown
Chief operating officer, Bulldog Battery Corporation
Commercial excellence roll-out manager, TVH Parts
President EPG Americas, Ehrhardt Partner Group (EPG)
CEO, Duravant
Crown RR5225-30TT321
Braeside, Melbourne, Victoria, Australia
Hire
Taylor TXB180S
Coraopolis, Pennsylvania, United States
Used - Sale & Hire
Upcoming industry events …
March 3-7, 2026 - Las Vegas, NV, United States
January 28-30, 2026 - Bangkok, Thailand
31 March 2026 - Dubai, United Arab Emirates
Global Industry News
edition #1261 - 18 December 2025
In this week’s Forkliftaction News , we report on an activist investment firm increasing its stake in Toyota Industries Corp (TICO), in a bid to stop the privatisation of the materials handling equipment manufacturer... Continue reading
Editorial calendar - planned features
CONSTRUCTION FORKLIFTS
HANDLING GOODS IN THE COLD
LOADING/UNLOADING FREIGHT
BROWNFIELD AUTOMATION
FORKLIFT ATTACHMENTS
BATTERY AFFORDABILITY AND LIFETIME
FORKLIFT SAFETY