Report this forum post

i recently had an injection pump rebuilt on a eagle picher rc60 forklift and reinstalled it. this unit has been sitting for about a year. bled fuel system, replaced battery, starter, starting solenoid, tested fuel shut off solenoid. unit still has a very slow crank almost as if battery was dead. removed all fuel lines and cleaned them out. installed new fuel filter. ensured i had no blockages in fuel system.
reinstalled all fuel lines yet unit still has slow crank. crack the injector lines and unit cranks over normal. also when unit sits for a day or so it will fire up immediately. if i drive it around for 10 to 15 mins then shut it down it will only crank super slow again. my theiroy was a blockage in the return lines like the pump it building pressure but has no where to go? i feel like i covered all my basics and yet unit still cranks slow. again only starts after it sits for a day. anyone have this same issue? i pop tested my injectors as well and they have a perfect spray pattern and pop at like 4200 to 4500 seems normal to me. really need some help on this one! if my pump is off by lets say one or two teeth could this happen? timing is everything but unit will drive and sounds normal while running does blow a lil white smoke at first but clears up while driving. any help would be much appreciated thanks
  • Posted 18 Jun 2025 07:12
  • By DALTON_LAKE
  • joined 18 Jun'25 - 1 message
  • California, United States

This is ONLY to be used to report flooding, spam, advertising and problematic (harassing, abusive or crude) posts.

Indicates mandatory field
Global Industry News
edition #1235 - 19 June 2025
Greek philosopher Heraclitus is credited with the famous saying “change is the only constant”, and this week’s Forkliftaction News demonstrates this is certainly true in the case of the materials handling sector... Continue reading
Upcoming industry events …
July 22-24, 2025 - Sydney, Australia
November 11-13, 2025 - Singapore, Singapore
November 12-13, 2025 - London, United Kingdom
Movers & Shakers
Pete Stanislawczyk Pete Stanislawczyk
Chief executive officer, East Penn Manufacturing
President, East Penn Manufacturing
APAC vice president, Jungheinrich
Senior VP direct sales and marketing, Daifuku Intralogistics America
Upcoming industry events …
July 22-24, 2025 - Sydney, Australia
November 11-13, 2025 - Singapore, Singapore
November 12-13, 2025 - London, United Kingdom
Latest job alerts …
Harrisburg, SD, United States
Ottumwa, IA, United States
Wentzville, MO, United States
Upcoming in the editorial calendar
WIRELESS CHARGING
Aug 2025
MANAGING MIXED FLEETS
Oct 2025