Report this forum post

Jim,

Behind the kick panel on the right side, the VSM is mounted to the front panel. The kick panel is held in with metal clips. Pry the lower part off the upper to remove. Go to VSM, the eighth connector down on the right side. That is where power is supplied to the relay. Pin nine or wire 754A red. Check connection at VSM and make sure pin or socket is seated in the connector. If all checks good, verify ohms reading from the pin to the relay. Good Luck
  • Posted 24 Mar 2025 23:55
  • By Fishmech
  • joined 12 Jul'17 - 370 messages
  • Virginia, United States
The hard to do we do right away. The impossible just takes a little longer.

This is ONLY to be used to report flooding, spam, advertising and problematic (harassing, abusive or crude) posts.

Indicates mandatory field
Editorial calendar - planned features
CONSTRUCTION FORKLIFTS
HANDLING GOODS IN THE COLD
LOADING/UNLOADING FREIGHT
BROWNFIELD AUTOMATION
FORKLIFT ATTACHMENTS
BATTERY AFFORDABILITY AND LIFETIME
FORKLIFT SAFETY

PREMIUM business

Libiao Robotics
Creating robotic warehouse solutions that automate and elevate your business.
Upcoming industry events …
January 28-30, 2026 - Bangkok, Thailand
March 4-5, 2026 - Detroit, Michigan, United States
March 24-26, 2026 - Stuttgart, Germany
Latest job alerts …
Dayton, OH, United States
Erie, PA, United States
Fact of the week
Foundling hatches are safe, anonymous drop-off points for unwanted infants, allowing parents in crisis a way to surrender a baby safely without fear of punishment, ensuring the child is rescued and cared for. The concept started in the 12th century, was abandoned in the late 19th century, then reintroduced in 1952. It has since been adopted in many countries.