Report this forum post

Ok do this. Negative to Q1 E and the positive to Q1 B. Run test O14 and with side shift button do a ramping test. Voltage should be 0-2.5v. If voltage ramps pass 3v replace power card. If it checks ok the your issue is the snubber circuit. Q1, reg 3, c1 or rec 2.
  • Posted 18 Apr 2020 03:35
  • Modified 18 Apr 2020 03:37 by poster
  • By Tony_Nene
  • joined 26 Aug'19 - 9 messages
  • Florida, United States
Code 23

This is ONLY to be used to report flooding, spam, advertising and problematic (harassing, abusive or crude) posts.

Indicates mandatory field
Editorial calendar - planned features
CONSTRUCTION FORKLIFTS
HANDLING GOODS IN THE COLD
LOADING/UNLOADING FREIGHT
BROWNFIELD AUTOMATION
FORKLIFT ATTACHMENTS
BATTERY AFFORDABILITY AND LIFETIME
FORKLIFT SAFETY

Showcased in the Virtual Expo

Movers & Shakers
Jett Chitanand Jett Chitanand
President EPG Americas, Ehrhardt Partner Group (EPG)
CEO, Duravant
Manager of automated solutions engineering and implementation, MHS Lift
President and CEO, Manitou Group
Briefs United States
Fact of the week
Foundling hatches are safe, anonymous drop-off points for unwanted infants, allowing parents in crisis a way to surrender a baby safely without fear of punishment, ensuring the child is rescued and cared for. The concept started in the 12th century, was abandoned in the late 19th century, then reintroduced in 1952. It has since been adopted in many countries.