Report this forum post

can you double check that model number?
my information only covers a GPX30/40/50E series
nothing like you said
but in that GPX information it does not break down the cylinder in any pictorial form, it just shows how to remove the cylinder and take the crosshead pieces off.
In the description it speaks of dissassembly and reassembly in detail and mentions the flow control valve which is in the base of the cylinder rod, it says to position it with the arrow pointing towards the piston.
  • Posted 9 Dec 2019 12:49
  • Modified 9 Dec 2019 12:51 by poster
  • By swoop223
  • joined 23 Mar'12 - 3,692 messages
  • North Carolina, United States
You've been swooped!
swoop223@gmail.com

This is ONLY to be used to report flooding, spam, advertising and problematic (harassing, abusive or crude) posts.

Indicates mandatory field

Showcased in the Virtual Expo

Editorial calendar - planned features
CONSTRUCTION FORKLIFTS
HANDLING GOODS IN THE COLD
LOADING/UNLOADING FREIGHT
BROWNFIELD AUTOMATION
FORKLIFT ATTACHMENTS
BATTERY AFFORDABILITY AND LIFETIME
FORKLIFT SAFETY

PREMIUM business

REPOWERTEK Inc
PRIME battery regenerators: the only technology and product line-up worldwide that overcomes the technical limitations of battery regeneration.
Latest job alerts …
Columbus, United States
Dayton, OH, United States
New York Staten Island, United States
Oxford Ct, United States
Movers & Shakers
Steven Ballerini Steven Ballerini
Chief executive officer, Australian Supply Chain & Logistics Association (ASCLA)
Engineering policy lead, Logistics UK
Regional manager - Eastern Canada, Associated Equipment Distributors
Vice president - IT & EP OEM parts, Big Joe Forklifts