first try this
cycle the power on and off 5 times
wait 10 seconds between each cycle of the power, see if codes clear after doing this.
If not then there may be a problem with the wiring in the harness to the platform control module. Check the connector where it plugs into the truck side and also the platform control module side.
These connectors do plug in and have a lock ring that has to be twisted to lock the connector into the plug so make sure it is completely inserted and locked into the connector properly.

If the cable and connectors check out ok visually and are connected properly then follow this procedure:

Manual suggests to remove the 9 pin platform control module connector from the side of the platform junction box and the P4 connector at the ground control module. Check continuity from the P4 connector, pin5 to junction box pin3 and P4, pin9 to junction box pin4. Is there continuity on these wires?
If no continuity repair wiring
If continuity then replace control module.
  • Posted 13 Mar 2019 23:24
  • By swoop223
  • joined 23 Mar'12 - 3,692 messages
  • North Carolina, United States
You've been swooped!
swoop223@gmail.com

This is ONLY to be used to report flooding, spam, advertising and problematic (harassing, abusive or crude) posts.

Indicates mandatory field
Fact of the week
Funerals in Spain typically occur within 24 to 48 hours of death, whereas in other European countries they wait one or more weeks. This rapid timeframe is a cultural norm grown from the past need to manage the warm climate without modern embalming.
Upcoming industry events …
October 8-10, 2025 - Lucca, Italy
June 17-20, 2026 - Bangkok Thailand, Thailand
August 19-21, 2026 - Bangkok Thailand, Thailand
Fact of the week
Funerals in Spain typically occur within 24 to 48 hours of death, whereas in other European countries they wait one or more weeks. This rapid timeframe is a cultural norm grown from the past need to manage the warm climate without modern embalming.
Mitsubishi FGE35AT
Yokohama, Japan
Used - Sale
Crown CG33P5
Braeside, Melbourne, Victoria, Australia
Hire
Movers & Shakers
Rob Ott Rob Ott
Executive vice president and chief commercial officer, East Penn Manufacturing
President, Logistics UK
Director of dealer development East Coast, Big Joe Forklifts
Vice president, customer, TVH Americas