nacco is to build a new factory close to nijmegen to build hyster 3,5 t-5,5 ton on a new production line.
nacco do not want invest in more production the future is electric such as new electric 8 ton as B299
This is ONLY to be used to report flooding, spam, advertising and problematic (harassing, abusive or crude) posts.