Crown RR3000:
Replaced Sequence Card and only have reach and lift . Tilt not working.

Truck originally had no functions working diagnosed it to a bad sequence card. Replaced the sequence card and installed new multiswitchs as well. The wiring was clustered on the switchs and lift and lower were not working. Rewired the Multiswitches and now works. Tested the reach and worked. the lift and lower work. The sequence goes thru each function. I can hear the solenoids click in lift and reach function but not in the tilt. When i use the tilt function it will reach in and out like its never switched over when using the sequence button. Ive went thru all i can think of trying to find this issue. Any one know if there is something missing im not looking at ? Thanks in advance
  • Posted 24 Aug 2023 09:09
  • Discussion started by Chad_Fulton
  • Michigan, United States
Showing items 1 - 2 of 2 results.
Thanks for the reply. I did change the switches on the new card to what the old card was setup for. I'm just wondering if I got a bad card.
  • Posted 24 Aug 2023 22:45
  • Reply by Chad_Fulton
  • Michigan, United States
there are dip switches on the card that you need to set to the number of options you have
copy your old card settings
  • Posted 24 Aug 2023 20:42
  • Reply by crownie
  • Victoria, Australia

Post your Reply

Forkliftaction.com accepts no responsibility for forum content and requires forum participants to adhere to the rules. Click here for more information.

Having trouble using the Discussion Forums? Contact us for help.

Movers & Shakers
Linda Häkkilä Linda Häkkilä
vice president, Investor Relations, Konecranes
vice president operations, Elokon Group
President, EP Equipment Europe
Senior vice president human resources, Kalmar
Latest job alerts …
Louisville, KY, United States
Dubuque, IA, United States
Louisville, KY, United States
UN Forklift FGL25T
HANGZHOU, Zhejiang, China
New - Sale
Terberg YT220
Balling, Denmark
Used - Sale

PREMIUM business

Shenzhen Wellwit Robotics Co., Ltd
The Largest AMR/AGV ODM/OEM Manufacturer in China.
Upcoming in the editorial calendar
Terberg YT222
Balling, Denmark
Used - Sale
Toyota 02-8FD25
Yokohama, Japan
Used - Sale
Upcoming industry events …
May 09-11, 2025 - Bangalore, India
October 21-23, 2025 - Panama City, Panama
July 15-17, 2025 - Hong Kong, Hong Kong
Movers & Shakers
Linda Häkkilä Linda Häkkilä
vice president, Investor Relations, Konecranes
vice president operations, Elokon Group
President, EP Equipment Europe
Senior vice president human resources, Kalmar