Discussion:
handle tenioner replacement and special tools needed

wanting to know how to replace the springs in the handle and how to load them after it is assembled.
  • Posted 14 Sep 2017 04:59
  • By MaintenanceJAR
  • joined 14 Sep'17 - 1 message
  • Indiana, United States
Showing items 1 - 1 of 1 results.
From the manual page M6.0-2720-001
Handle and Knuckle Disassembly
Should it become necessary to remove the control handle
from the knuckle to replace springs and/or shaft, or make
repairs to the assembly. The following steps should be
followed:
1. Lift and block truck as needed, and disconnect battery.
2. Raise control handle to its full upright position.
3. Drive out roll pin holding left side of shaft. The shaft
should turn counterclockwise approximately 20°. If the
shaft does not rotate a face spanner wrench may be
used to rotate the shaft and relieve the spring tension.
4. Drive the shaft toward the right side as needed to
remove springs.
5. Thoroughly clean all steer components and inspect
springs, shaft and knuckle for uneven wear or cracks.
If necessary replace any components at this time.

Handle and Knuckle Assembly
Before assembling handle, springs, and knuckle, inspect all
components for uneven wear, cracks, or other damage. If
any abnormal wear or damage appears that creates any
doubt that steering may be affected, replace with new parts
Assemble the control handle and springs as follows:
1. Reverse steps 1 thru 5 above.
2. With control handle in its full upright position, tension
the rotary shaft by using a face spanner wrench and
turning approximately 20° clockwise or until the roll pin
holes align with the knuckle.
3. Drive a roll pin into position to hold shaft and spring
assembly in place.
4. Check for proper operation.
Spring Adjustment
The rotary shaft is fixed on the left side at the knuckle with a
roll pin. If the spring pressure reduces over time or the handle
no longer returns to the upright position, the springs can be
re-tensioned as follows:
1. Lift and block truck as needed, and disconnect battery.
2. Raise control handle to its full upright position.
3. Drive out roll pin holding left side of shaft. Using a face
spanner wrench rotate the shaft clockwise until the
offset roll pin hole on the right side aligns with the
knuckle and drive in new roll pin.
4. Check for proper operation.
  • Posted 3 Jan 2018 17:01
  • By margaret_w
  • joined 27 Dec'17 - 8 messages
  • Arizona, United States

Post your Reply

Forkliftaction accepts no responsibility for forum content and requires forum participants to adhere to our rules of conduct. Click here for more information.

If you are having trouble using the Discussion Forums, please contact us for help.

Komatsu FD25T17
Braeside, Melbourne, Victoria, Australia
Hire
SMV (Konecranes) 4632TC5
Balling, Denmark
Used - Sale
Upcoming industry events …
September 24-25, 2025 - Tangiers, Morocco
September 25, 2025 - South Brisbane, QLD, Australia
October 23, 2025 - Atlanta, GA, United States
Fact of the week
At the opening ceremony of the Sydney Harbour Bridge in 1932, marching bands were instructed to walk out of step as they crossed the bridge. This unusual directive was given as a precaution due to concerns about the bridge's structural integrity during its early use.
Global Industry News
edition #1247 - 11 September 2025
In what may prove to be a sign of things to come, Canadian materials handling equipment lithium-ion battery manufacturer, UgoWork, has announced battery assembly for some forklifts bound for the North American domestic market will now be done in the US. See the story for full details... Continue reading
Komatsu FD25T17
Braeside, Melbourne, Victoria, Australia
Hire
SMV (Konecranes) 4632TC5
Balling, Denmark
Used - Sale
Upcoming industry events …
September 24-25, 2025 - Tangiers, Morocco
September 25, 2025 - South Brisbane, QLD, Australia
October 23, 2025 - Atlanta, GA, United States
Movers & Shakers
Andries Retief Andries Retief
Chief development officer, DHL
Director, ICHCA Australia
CEO, TVH
Sales and operations director, Logitrans A/S
Komatsu FD25T17
Braeside, Melbourne, Victoria, Australia
Hire
SMV (Konecranes) 4632TC5
Balling, Denmark
Used - Sale
Latest job alerts …
Danville, IL, United States
Fact of the week
At the opening ceremony of the Sydney Harbour Bridge in 1932, marching bands were instructed to walk out of step as they crossed the bridge. This unusual directive was given as a precaution due to concerns about the bridge's structural integrity during its early use.