Discussion:
Fiat, EV-100, IC3645EV T1, OSC ASM

Hello, dear colleagues.
I am repairing a Fiat electric forklift, the model is difficult to read. But it does not matter, the main thing is the controller.
Problem: I press the drive pedal, the forklift tries to move, but cannot. Sometimes it moves very slowly. If I press the pedal more than 50%, then after 5-10 seconds something similar to a blow happens. This is the full voltage suddenly supplied to the motors. The forklift jerks and stops. But it is not 1A that is triggered, but 1REC that opens. To check, I disconnected 1A so that it could not affect. After the second blow, the protection is triggered and you need to turn the ignition key off and on to try again.
I can not find how often the pulses should go to 1REC. I looked with an oscilloscope, about 100 Hz.
I am tired. I checked the power controlled diodes.
I do not know what to do anymore.
  • Posted 24 Jul 2024 23:51
  • By Vacheclav
  • joined 24 Jul'24 - 3 messages
  • Moldova, Republic Of
I wish you health and a great mood.
Showing items 1 - 2 of 2 results.
I threw this controller away and installed a new one - 1205M. I am happy with it, everything works.
Good work to all!
  • Posted 29 Aug 2024 16:36
  • By Vacheclav
  • joined 24 Jul'24 - 3 messages
  • Moldova, Republic Of
I wish you health and a great mood.
I checked the polar capacitors on the control board. Their ERS and capacity are normal.
It will take a long time to wait for a new controller. The old unit mainly consists of simple components. It can always be repaired. But there are still two incomprehensible microcircuits inside.
  • Posted 29 Jul 2024 15:33
  • By Vacheclav
  • joined 24 Jul'24 - 3 messages
  • Moldova, Republic Of
I wish you health and a great mood.

Post your Reply

Forkliftaction accepts no responsibility for forum content and requires forum participants to adhere to our rules of conduct. Click here for more information.

If you are having trouble using the Discussion Forums, please contact us for help.

JLG G12-55A
Morgantown, Pennsylvania, United States
Used - Sale & Hire
Terberg RT403
Balling, Denmark
Used - Sale
Latest job alerts …
Editorial calendar - planned features
CONSTRUCTION FORKLIFTS
HANDLING GOODS IN THE COLD
LOADING/UNLOADING FREIGHT
BROWNFIELD AUTOMATION
FORKLIFT ATTACHMENTS
BATTERY AFFORDABILITY AND LIFETIME
FORKLIFT SAFETY
Latest job alerts …
Editorial calendar - planned features
CONSTRUCTION FORKLIFTS
HANDLING GOODS IN THE COLD
LOADING/UNLOADING FREIGHT
BROWNFIELD AUTOMATION
FORKLIFT ATTACHMENTS
BATTERY AFFORDABILITY AND LIFETIME
FORKLIFT SAFETY
Upcoming industry events …
December 4–7, 2025 - Goyang, Korea, Republic Of
March 10-12, 2026 - Hong Kong, Hong Kong
June 30-July 2, 2026 - Birmingham, United Kingdom
Fact of the week
According to studies published in the English Journal of Medicine, the impact of daylight savings is revealed by a 24% increase in heart attacks on the Monday following the spring shift forward. When clocks move back in autumn, heart attacks drop by about 21%, suggesting that loss of sleep is an important driver.