Discussion:
Error code 393 , 373

I have a Crown forklift WP-3020 , battery pack had a problem and water dissapeared, now i installed new battery pack.

After starting i have error code 373 , and after that 393.

What can be wrong ?
  • Posted 14 Feb 2016 13:01
  • By ct10dre
  • joined 12 Feb'16 - 3 messages
  • constanta, Romania
Showing items 1 - 2 of 2 results.
Hi,
I am facing similar problem. Error 393 and 365.

Is 393 related to encoder?

Please advise what to do?
  • Posted 25 Mar 2016 18:20
  • By robin_c
  • joined 25 Mar'16 - 1 message
  • Ontario, Canada
Encoder fault -check wires to the encoder plug sometimes they pull loose and don't make contact inside plug but the encoders do go bad
  • Posted 11 Mar 2016 11:30
  • By troy_m
  • joined 13 Sep'08 - 112 messages
  • Ontario, Canada

Post your Reply

Forkliftaction accepts no responsibility for forum content and requires forum participants to adhere to our rules of conduct. Click here for more information.

If you are having trouble using the Discussion Forums, please contact us for help.

Fact of the week
According to studies published in the English Journal of Medicine, the impact of daylight savings is revealed by a 24% increase in heart attacks on the Monday following the spring shift forward. When clocks move back in autumn, heart attacks drop by about 21%, suggesting that loss of sleep is an important driver.
Global Industry News
edition #1258 - 27 November 2025
In this week’s Forkliftaction News , we report on Hyster-Yale laying off staff in the US amid what it describes as “challenging market conditions”... Continue reading
Fact of the week
According to studies published in the English Journal of Medicine, the impact of daylight savings is revealed by a 24% increase in heart attacks on the Monday following the spring shift forward. When clocks move back in autumn, heart attacks drop by about 21%, suggesting that loss of sleep is an important driver.
Global Industry News
edition #1258 - 27 November 2025
In this week’s Forkliftaction News , we report on Hyster-Yale laying off staff in the US amid what it describes as “challenging market conditions”... Continue reading
Editorial calendar - planned features
CONSTRUCTION FORKLIFTS
HANDLING GOODS IN THE COLD
LOADING/UNLOADING FREIGHT
BROWNFIELD AUTOMATION
FORKLIFT ATTACHMENTS
BATTERY AFFORDABILITY AND LIFETIME
FORKLIFT SAFETY