Discussion:
Error 4:180

Error code 4:180. Service Manual Troubleshooting - Step 1) Is to verify valve Q2 opens. In service mode pulling back on the reach lever should extend the main lift but does not! Pump runs but no main lift.
CID diagnostic (4) pos. 7&8 inputs change when B19 is rotated by hand.
Do I pursue the Q2 no lift issue, or go after the height indicator, which seems to be working.
  • Posted 20 Sep 2017 01:59
  • By UncleSi
  • joined 12 Feb'13 - 135 messages
  • Manitoba, Canada
Showing items 1 - 1 of 1 results.
Also upon start-up CID display shows a box with a question mark ? and 2 arrows pointing up. Turns out that's a big clue!
Apparently the 2 magnetic sensors on the same bracket as B19 at the top of the mast were faulty and "confused" the lift from having any idea where the mast was in height.
It was doing all sorts of "funky" things but after changing the whole B19 and mag sensor assembly it's happy as ****!!
As usual - "You find success on the far side of failure!!"
  • Posted 20 Sep 2017 03:24
  • By UncleSi
  • joined 12 Feb'13 - 135 messages
  • Manitoba, Canada

Post your Reply

Forkliftaction accepts no responsibility for forum content and requires forum participants to adhere to our rules of conduct. Click here for more information.

If you are having trouble using the Discussion Forums, please contact us for help.

Latest job alerts …
Muncie, IN, United States
Enforcer FLBAXT25
Braeside, Melbourne, Victoria, Australia
Hire
Terberg RT403
Balling, Denmark
Used - Sale
Movers & Shakers
Deborah Baker Deborah Baker
Board chair, Equipment Leasing & Finance Association
Vice president of manufacturing operations, Hytrol Conveyor Company
VP sales Europe, EP Equipment Europe
Group president - Vancouver operations, Columbia Machine
Global Industry News
edition #1255 - 6 November 2025
In this week’s Forkliftaction News , Hyster-Yale says it is reducing production because of “softer demand” as it reports revenue for Q3 was USD979 million, a drop both year-on-year and quarter-on-quarter... Continue reading
Editorial calendar - planned features
CONSTRUCTION FORKLIFTS
HANDLING GOODS IN THE COLD
LOADING/UNLOADING FREIGHT
BROWNFIELD AUTOMATION
FORKLIFT ATTACHMENTS
BATTERY AFFORDABILITY AND LIFETIME
FORKLIFT SAFETY