Discussion:
faults with truck.toyota bt levio lwe200 serial 6090717 yr 2009

i have a above truck with several faults.
1,when operating the hydraulics it cuts out no drive and a fault codes come up2.001 and the zapi controllor flashes 2 times.
if i take the power lead of the hydraulic pump i have no problems it will drive when operating the hydraulic it does not cut out there is no problem with the hydraulic pump motor was tested.
and the zapi controllor has no poblems swapped with a another truck.
2,by swapping zapi units the truck comes up with another fault i believe because off swapping the controllers over is this right.
3,has i havent got a manual for this truck i am having problems to try and check and reset the truck.
  • Posted 29 Jan 2017 22:47
  • By greasespoon
  • joined 30 Jul'09 - 154 messages
  • somerset, United Kingdom
Showing items 1 - 1 of 1 results.
Hii
I have a bt rt services maual
  • Posted 5 Mar 2017 18:21
  • By keshav_m
  • joined 22 Feb'17 - 3 messages
  • Maharashtra, India

Post your Reply

Forkliftaction accepts no responsibility for forum content and requires forum participants to adhere to our rules of conduct. Click here for more information.

If you are having trouble using the Discussion Forums, please contact us for help.

Movers & Shakers
Andries Retief Andries Retief
Chief development officer, DHL
Director, ICHCA Australia
CEO, TVH
Sales and operations director, Logitrans A/S
Global Industry News
edition #1247 - 11 September 2025
In what may prove to be a sign of things to come, Canadian materials handling equipment lithium-ion battery manufacturer, UgoWork, has announced battery assembly for some forklifts bound for the North American domestic market will now be done in the US. See the story for full details... Continue reading

PREMIUM business

F. Uchiyama
Global exporter of used forklift and construction machinery, servicing over 80 countries.
Fact of the week
At the opening ceremony of the Sydney Harbour Bridge in 1932, marching bands were instructed to walk out of step as they crossed the bridge. This unusual directive was given as a precaution due to concerns about the bridge's structural integrity during its early use.