Report this forum post

Open the mast full and there are two elongated slots on the opposite side to the platform to check the chains with, you need the correct WAVE chain gauge as its the right length to fit the distance between the slots.
  • Posted 17 Jan 2016 14:57
  • By techno_nz
  • joined 9 Aug'13 - 138 messages
  • Canterbury, New Zealand

This is ONLY to be used to report flooding, spam, advertising and problematic (harassing, abusive or crude) posts.

Indicates mandatory field
Fact of the week
At the opening ceremony of the Sydney Harbour Bridge in 1932, marching bands were instructed to walk out of step as they crossed the bridge. This unusual directive was given as a precaution due to concerns about the bridge's structural integrity during its early use.

PREMIUM business

Tailift Material Handling USA Inc
Part of Toyota Industries Group - Leading manufacturer of High-quality machines.
Latest job alerts …
Danville, IL, United States
Upcoming in the editorial calendar
MANAGING MIXED FLEETS
Oct 2025
ASSET FINANCE
Nov 2025