Report this forum post

I know this is an old thread but wanted to share a note.

SP3450H
My problem was 814 @ power up. MRC1 was not powering up & ED2 not closing. Had already checked off the two 814 steps in the book. OK

MRC1 was not getting B+ at CA402-14. This comes from CA212-8 (no B+ @ CA212-8 either). Following the dist board diag this power comes from the bank of caps bott right center of board.

Luckily I have an old dist board with other issues to swap in for test. Problem resolved!

-Yes, K2 was checked
-Yes, All Connections/plugs were checked.

Confirmed by reinst. orig board and problem returned.

Update: Uppon inspection of old dist board I found the solder point of the large coil (bottom center) next to CR7 had broke. For whatever reason this board DID NOT have the white silicone on the coil and caps like most current dist boards have now. I re-soldered the landing point and tested the board. No fail! :)
  • Posted 18 Aug 2015 03:51
  • Modified 22 Aug 2015 02:01 by poster
  • By chevotaman
  • joined 28 Feb'14 - 112 messages
  • Texas, United States
It's all just nuts n' bolts.

This is ONLY to be used to report flooding, spam, advertising and problematic (harassing, abusive or crude) posts.

Indicates mandatory field
JLG G12-55A
Morgantown, Pennsylvania, United States
Used - Sale & Hire
Crown CG33P5
Braeside, Melbourne, Victoria, Australia
Hire
Upcoming industry events …
December 4–7, 2025 - Goyang, Korea, Republic Of
March 10-12, 2026 - Hong Kong, Hong Kong
June 30-July 2, 2026 - Birmingham, United Kingdom
Editorial calendar - planned features
CONSTRUCTION FORKLIFTS
HANDLING GOODS IN THE COLD
LOADING/UNLOADING FREIGHT
BROWNFIELD AUTOMATION
FORKLIFT ATTACHMENTS
BATTERY AFFORDABILITY AND LIFETIME
FORKLIFT SAFETY
Fact of the week
According to studies published in the English Journal of Medicine, the impact of daylight savings is revealed by a 24% increase in heart attacks on the Monday following the spring shift forward. When clocks move back in autumn, heart attacks drop by about 21%, suggesting that loss of sleep is an important driver.
JLG G12-55A
Morgantown, Pennsylvania, United States
Used - Sale & Hire
Crown CG33P5
Braeside, Melbourne, Victoria, Australia
Hire

PREMIUM business

VETTER Industrie GmbH
The world's most comprehensive range of forks and the most intelligent sensor fork for more safety and efficiency.
Editorial calendar - planned features
CONSTRUCTION FORKLIFTS
HANDLING GOODS IN THE COLD
LOADING/UNLOADING FREIGHT
BROWNFIELD AUTOMATION
FORKLIFT ATTACHMENTS
BATTERY AFFORDABILITY AND LIFETIME
FORKLIFT SAFETY