Report this forum post

I am working on a JLG 1930es from 2004. Unit powers up from the ground position of the switch, but nothing happens when switched to the platform position. Power from the switch goes directly to the printed circuit board in the ground control box, when the ground position switch is in the on position a surface mount relay on the board clicks, a red led comes on, and my analyzer powers up. However in the platform position there is no relay activation, no red led, and no analyzer display, due to no power. The pcb supplys power to all systems according to the service information I have found as well as power to the analyzer. Therefore I replaced the pcb and I still have no power in the platform position. Any ideas?
  • Posted 27 Aug 2014 13:27
  • Modified 27 Aug 2014 13:32 by poster
  • By jeremy_s
  • joined 28 Mar'08 - 205 messages
  • California, United States

This is ONLY to be used to report flooding, spam, advertising and problematic (harassing, abusive or crude) posts.

Indicates mandatory field
Maxlion FB25EH
Hangzhou, China
New - Sale
Toyota 8FGU25
Flesherton, Ontario, Canada
Used - Sale

PREMIUM business

Hangzhou Maxlion Machinery Equipment Co., Ltd
3G Standard, Good Products, Good Price, Good Service.
Global Industry News
edition #1247 - 11 September 2025
In what may prove to be a sign of things to come, Canadian materials handling equipment lithium-ion battery manufacturer, UgoWork, has announced battery assembly for some forklifts bound for the North American domestic market will now be done in the US. See the story for full details... Continue reading

Showcased in the Virtual Expo

Fact of the week
At the opening ceremony of the Sydney Harbour Bridge in 1932, marching bands were instructed to walk out of step as they crossed the bridge. This unusual directive was given as a precaution due to concerns about the bridge's structural integrity during its early use.
Maxlion FB25EH
Hangzhou, China
New - Sale
Toyota 8FGU25
Flesherton, Ontario, Canada
Used - Sale

Showcased in the Virtual Expo

Latest job alerts …
Danville, IL, United States
Fact of the week
At the opening ceremony of the Sydney Harbour Bridge in 1932, marching bands were instructed to walk out of step as they crossed the bridge. This unusual directive was given as a precaution due to concerns about the bridge's structural integrity during its early use.