Report this forum post

Thanks everyone for the hints. I appreciate it.

Here is what I found:
1) Connector behind panel was partially unplugged, pushed them together and put a zip tie on it.

When I reconnected this things changed, now I do not get a wrench, I do get the triangle/question mark. Still does not operate.

In addition:
1) Battery voltage is ok.
2) ED Switch on the platform is broken and only stay up, does not lock down like the one on the base does. Currently disabled for testing.

I will check the voltages on the terminal blocks tonight. How does one purchase the actual wiring diagram for one of these? And how many times can they use White/Red stripe?!!? lol

Thanks again guys.

Andrew
  • Posted 30 Jul 2014 06:01
  • By Falcon256
  • joined 29 Jul'14 - 4 messages
  • Illinois, United States

This is ONLY to be used to report flooding, spam, advertising and problematic (harassing, abusive or crude) posts.

Indicates mandatory field
Global Industry News
edition #1260 - 11 December 2025
In this week’s Forkliftaction News we report on DHL Supply Chain signing a deal to deploy autonomous mobile robots (AMRs) at its Mexican retail operations and look at Guidance Automation’s successful trial of an AMR with a hydrogen fuel cell... Continue reading
Editorial calendar - planned features
CONSTRUCTION FORKLIFTS
HANDLING GOODS IN THE COLD
LOADING/UNLOADING FREIGHT
BROWNFIELD AUTOMATION
FORKLIFT ATTACHMENTS
BATTERY AFFORDABILITY AND LIFETIME
FORKLIFT SAFETY
SMV (Konecranes) 20-1200B
Balling, Denmark
Used - Sale
Unicarriers FHGE35T5S
Yokohama, Japan
Used - Sale

PREMIUM business

Tailift Material Handling Taiwan Co.,Ltd.
Focused simply for the new era.
Global Industry News
edition #1260 - 11 December 2025
In this week’s Forkliftaction News we report on DHL Supply Chain signing a deal to deploy autonomous mobile robots (AMRs) at its Mexican retail operations and look at Guidance Automation’s successful trial of an AMR with a hydrogen fuel cell... Continue reading
Movers & Shakers
Jett Chitanand Jett Chitanand
President EPG Americas, Ehrhardt Partner Group (EPG)
CEO, Duravant
Manager of automated solutions engineering and implementation, MHS Lift
President and CEO, Manitou Group