Report this forum post

The tilt problem is a piston. Have them apart now with the new parts sitting next to them. Just need some time to get it done. The 25 will be a challenge. I will attempt to repack myself. Stubborn that way. Ordered master cyl and kit for the brake and inching valve. I will post the results. Thanks all. Cliff,
  • Posted 23 Mar 2014 05:49
  • By clifford_b
  • joined 14 Mar'14 - 5 messages
  • Massachusetts, United States

This is ONLY to be used to report flooding, spam, advertising and problematic (harassing, abusive or crude) posts.

Indicates mandatory field
Upcoming in the editorial calendar
WIRELESS CHARGING
Aug 2025
MANAGING MIXED FLEETS
Oct 2025
Upcoming in the editorial calendar
WIRELESS CHARGING
Aug 2025
MANAGING MIXED FLEETS
Oct 2025
US confidence index rises sharply Washington, DC, United States
Upcoming industry events …
July 9-10, 2025 - Birmingham, United Kingdom
October 21-23, 2025 - Panama City, Panama
Upcoming in the editorial calendar
WIRELESS CHARGING
Aug 2025
MANAGING MIXED FLEETS
Oct 2025