ok...forklift is now operational. after getting advice to check voltage at J1 Pn6 on the Curtis 1310 master controller we then checked both slack chain switches again. they both check out ok. however, one had open wire. apparently these units have issues with the wiring as was mentioned beforehand in a previous post. thanks everyone for your help.

jay
  • Posted 25 Feb 2014 13:25
  • By glenn_levit7
  • joined 10 Jul'07 - 78 messages
  • Texas, United States
Montacargas, Tequila y Limon!

This is ONLY to be used to report flooding, spam, advertising and problematic (harassing, abusive or crude) posts.

Indicates mandatory field
Global Industry News
edition #1244 - 21 August 2025
In our feel good story for the week, we report on a donation from Wisconsin-headquartered Big Joe Forklifts to the University of Wisconsin-Madison’s College of Engineering, after discovering the institution was still using one of its 1960s walkie stackers... Continue reading
Movers & Shakers
Jan Zuurbier Jan Zuurbier
Global CEO, Swisslog
Board member, UKMHA
Strategic advisor, Roboteon
CEO Americas, Hai Robotics
Global Industry News
edition #1244 - 21 August 2025
In our feel good story for the week, we report on a donation from Wisconsin-headquartered Big Joe Forklifts to the University of Wisconsin-Madison’s College of Engineering, after discovering the institution was still using one of its 1960s walkie stackers... Continue reading
Movers & Shakers
Jan Zuurbier Jan Zuurbier
Global CEO, Swisslog
Board member, UKMHA
Strategic advisor, Roboteon
CEO Americas, Hai Robotics