The control side of traction speed, 12v goes throught door switch, brake switch, sas or belly switch, fwd or rev switch,back down to terminal bd in the middle up to contractors, any resistance in that circuit , doesn't allow enough voltage to operate coils of contractors, low bat volts, bad switches, bottom of mast switch, or bad switch above b contactor, not supplying -ve to c. All have a bearing on 3rd speed.
All lift pump motors are serviceable, and should be checked every service.brushes are replaceable.
  • Posted 11 May 2013 12:47
  • By southernviking
  • joined 25 Mar'13 - 43 messages
  • South Island, New Zealand

This is ONLY to be used to report flooding, spam, advertising and problematic (harassing, abusive or crude) posts.

Indicates mandatory field
Global Industry News
edition #1255 - 6 November 2025
In this week’s Forkliftaction News , Hyster-Yale says it is reducing production because of “softer demand” as it reports revenue for Q3 was USD979 million, a drop both year-on-year and quarter-on-quarter... Continue reading
Editorial calendar - planned features
CONSTRUCTION FORKLIFTS
HANDLING GOODS IN THE COLD
LOADING/UNLOADING FREIGHT
BROWNFIELD AUTOMATION
FORKLIFT ATTACHMENTS
BATTERY AFFORDABILITY AND LIFETIME
FORKLIFT SAFETY
Movers & Shakers
Deborah Baker Deborah Baker
Board chair, Equipment Leasing & Finance Association
Vice president of manufacturing operations, Hytrol Conveyor Company
VP sales Europe, EP Equipment Europe
Group president - Vancouver operations, Columbia Machine
SMV (Konecranes) 4632CC5
Balling, Denmark
New - Sale
SMV (Konecranes) 16-1200C
Balling, Denmark
Used - Sale
Upcoming industry events …
February 5-7, 2026 - Mumbai, India
April 14-16, 2026 - São Paulo, Brazil
June 9-11, 2026 - Johannesburg, South Africa
Latest job alerts …
Muncie, IN, United States