Report this forum post

It's a Yale 5000 with a 3 section mast. We had a forklift company take a look at it and they just scratched their heads. They soaked the tracks down with lubed and checked the channels - said they looked ok. We bought the machine used about 5 years ago, treated pretty easy. Had the seal replaced in the center cylinder a year or so ago. It was leaking.

I think it would be with the hydraulics because the upper mast sections begin to move up before they are suppose to. (before the lower section reaches it's full extention)
  • Posted 13 Apr 2007 11:59
  • By Suzi
  • joined 13 Apr'07 - 2 messages
  • Texas, United States

This is ONLY to be used to report flooding, spam, advertising and problematic (harassing, abusive or crude) posts.

Indicates mandatory field
Global Industry News
edition #1247 - 11 September 2025
In what may prove to be a sign of things to come, Canadian materials handling equipment lithium-ion battery manufacturer, UgoWork, has announced battery assembly for some forklifts bound for the North American domestic market will now be done in the US. See the story for full details... Continue reading
Fact of the week
At the opening ceremony of the Sydney Harbour Bridge in 1932, marching bands were instructed to walk out of step as they crossed the bridge. This unusual directive was given as a precaution due to concerns about the bridge's structural integrity during its early use.