Thanks for the reply.

The motor rewinders just called me and they have the motor running and want to go with me to install it and check for current draw before they rewind it. The armature is burned evenly all the way around it, not like two commutator bars and the related windings so at least the motor wasn't stalling out. But I guess under load, it heated up pretty badly but kept on running. The only reason it stopped running was that the winding insulators melted and coated the armature enough that it seized it to the magnetic bars on the case.

How am I going to check the hydraulic system if the amp draw is too high? Assuming that the relief valve pressure is correctly adjusted, what else could there be?
  • Posted 22 Feb 2012 02:59
  • By sleepywheel
  • joined 18 Jan'08 - 77 messages
  • British Columbia, Canada
sleepywheel at gmail.com

This is ONLY to be used to report flooding, spam, advertising and problematic (harassing, abusive or crude) posts.

Indicates mandatory field
Movers & Shakers
Deborah Baker Deborah Baker
Board chair, Equipment Leasing & Finance Association
Vice president of manufacturing operations, Hytrol Conveyor Company
VP sales Europe, EP Equipment Europe
Group president - Vancouver operations, Columbia Machine
UN Forklift FBT18NQZ1
HANGZHOU, Zhejiang, China
New - Sale
Crown RR5225-30TT321
Braeside, Melbourne, Victoria, Australia
Hire
Global Industry News
edition #1255 - 6 November 2025
In this week’s Forkliftaction News , Hyster-Yale says it is reducing production because of “softer demand” as it reports revenue for Q3 was USD979 million, a drop both year-on-year and quarter-on-quarter... Continue reading
Fact of the week
In Germany, the 9th of November is sometimes called Schicksalstag, the "Day of Fate" because it has been the day for several major historical events, including the horrors of Kristallnacht in 1938 and the fall of the Berlin Wall in 1989.