Report this forum post

Yeah, chublil, but then us in-housers have days like today. For the past 2 weeks the operators have been working 12s with the 2 shifts over-lapping from 8am-3pm. EVERYTHING that rolls is on the floor so I've been spending all that time (after running out of self induced "make-work" and "gov't projects") sitting at my desk reading or playing on my PC.....until I walked in this morning.....Pkg. line/auto stretch wrapper down, conveyor system jacked up, 2 reach trucks and a LP Clark down and an E-mail from my boss to rent more orderpickers and spec a 15K lift for a branch in Arkansas...today. It's gonna be a long day.
  • Posted 8 Jun 2011 23:14
  • By joe_d
  • joined 25 May'10 - 253 messages
  • Texas, United States
Ain't nothing I can't fix but a broken heart and the break of day!

This is ONLY to be used to report flooding, spam, advertising and problematic (harassing, abusive or crude) posts.

Indicates mandatory field

PREMIUM business

GemOne
Telematics for industrial fleets. Fleet & safety management solutions: track vehicles, boost efficiency, operate safer, & avoid unexpected downtime.
Fact of the week
At the opening ceremony of the Sydney Harbour Bridge in 1932, marching bands were instructed to walk out of step as they crossed the bridge. This unusual directive was given as a precaution due to concerns about the bridge's structural integrity during its early use.
Morooka MFD20
Yokohama, Japan
Used - Sale
Wellwit WMF1000
Shenzhen, Guangdong, China
New - Sale
USD50,000

PREMIUM business

GemOne
Telematics for industrial fleets. Fleet & safety management solutions: track vehicles, boost efficiency, operate safer, & avoid unexpected downtime.
Fact of the week
At the opening ceremony of the Sydney Harbour Bridge in 1932, marching bands were instructed to walk out of step as they crossed the bridge. This unusual directive was given as a precaution due to concerns about the bridge's structural integrity during its early use.