Report this forum post

Lets be realistic.

Theoretical calculations are one thing.

" out in the field " as you say is another.

There you must allow for stupid operators, Bad loads , uncertain ground conditions Etc Etc

Anybody who does not allow 25% for those little extra's can expect trouble.
  • Posted 26 Nov 2009 23:36
  • By Normandy
  • joined 28 Sep'06 - 186 messages
  • Co. Cork, Ireland

This is ONLY to be used to report flooding, spam, advertising and problematic (harassing, abusive or crude) posts.

Indicates mandatory field

PREMIUM business

MAXAM Tire, Inc.
Simplify your productivity with MAXAM's range of performance material handling tires, designed with the latest EcoPoint3 technology.
Global Industry News
edition #1245 - 28 August 2025
In this week’s Forkliftaction News , we look at MHEDA’s Q3 Economic Advisory Report which reveals current resilience in the US materials handling sector... Continue reading
Movers & Shakers
Steve Dimitrovski Steve Dimitrovski
Director sales for Australia and New Zealand, Swisslog
General Manager, Forkpro Australia
Global CEO, Swisslog
Board member, UKMHA

PREMIUM business

MAXAM Tire, Inc.
Simplify your productivity with MAXAM's range of performance material handling tires, designed with the latest EcoPoint3 technology.

PREMIUM business

MAXAM Tire, Inc.
Simplify your productivity with MAXAM's range of performance material handling tires, designed with the latest EcoPoint3 technology.
Global Industry News
edition #1245 - 28 August 2025
In this week’s Forkliftaction News , we look at MHEDA’s Q3 Economic Advisory Report which reveals current resilience in the US materials handling sector... Continue reading