Lets be realistic.
Theoretical calculations are one thing.
" out in the field " as you say is another.
There you must allow for stupid operators, Bad loads , uncertain ground conditions Etc Etc
Anybody who does not allow 25% for those little extra's can expect trouble.
This is ONLY to be used to report flooding, spam, advertising and problematic (harassing, abusive or crude) posts.