Discussion:
No high speed

I have an easi-b with no high speed? Reach and mast switches check ok. Replaced system card , vfc card and encoder. If I remove the encoder belt the truck ramps up to high speed until I get code 29. I'm thinking regen,q1, or power card. What do you guy's think and thanks.

Nitetime
  • Posted 16 May 2015 00:24
  • By nitetime
  • joined 6 Feb'14 - 17 messages
  • Michigan, United States
Showing items 1 - 3 of 3 results.
I have had dry batteries cause this before.
also low drive motor field resistance.
  • Posted 16 May 2015 05:44
  • By stam
  • joined 12 Aug'12 - 779 messages
  • Ontario, Canada
I forgot I also swapped out the control handle with a raymond rebuilt. I have speed set at 7.5 and switches at 3.5
  • Posted 16 May 2015 01:07
  • By nitetime
  • joined 6 Feb'14 - 17 messages
  • Michigan, United States
regen q1 and power card are going to get you nowhere.

what is the speed set to in config?
is the throttle pot reaching limits?

if it runs fast when belt is off that has proved all your drive components to be ok.
  • Posted 16 May 2015 00:52
  • By stam
  • joined 12 Aug'12 - 779 messages
  • Ontario, Canada

Post your Reply

Forkliftaction accepts no responsibility for forum content and requires forum participants to adhere to our rules of conduct. Click here for more information.

If you are having trouble using the Discussion Forums, please contact us for help.

Crown WP302020
Braeside, Melbourne, Victoria, Australia
Hire
Terberg YT222
Balling, Denmark
Used - Sale
Upcoming industry events …
January 28-30, 2026 - Bangkok, Thailand
March 4-5, 2026 - Detroit, Michigan, United States
March 24-26, 2026 - Stuttgart, Germany
Editorial calendar - planned features
CONSTRUCTION FORKLIFTS
HANDLING GOODS IN THE COLD
LOADING/UNLOADING FREIGHT
BROWNFIELD AUTOMATION
FORKLIFT ATTACHMENTS
BATTERY AFFORDABILITY AND LIFETIME
FORKLIFT SAFETY
Crown WP302020
Braeside, Melbourne, Victoria, Australia
Hire
Terberg YT222
Balling, Denmark
Used - Sale
Upcoming industry events …
January 28-30, 2026 - Bangkok, Thailand
March 4-5, 2026 - Detroit, Michigan, United States
March 24-26, 2026 - Stuttgart, Germany
Movers & Shakers
Jett Chitanand Jett Chitanand
President EPG Americas, Ehrhardt Partner Group (EPG)
CEO, Duravant
Manager of automated solutions engineering and implementation, MHS Lift
President and CEO, Manitou Group

PREMIUM business

Cascade Corporation (World HQ)
Leading manufacturers of attachments, forks and related technologies for forklifts and AGVs.
Latest job alerts …
Erie, PA, United States
Dayton, OH, United States
Editorial calendar - planned features
CONSTRUCTION FORKLIFTS
HANDLING GOODS IN THE COLD
LOADING/UNLOADING FREIGHT
BROWNFIELD AUTOMATION
FORKLIFT ATTACHMENTS
BATTERY AFFORDABILITY AND LIFETIME
FORKLIFT SAFETY